Sunday, March 25, 2012

Kiln Construction: Day 2

Construction on day two started early as the weather forcast was for a max of 34 Celsius . First was the construction of the firebox.

I then started construction on the platform (kiln floor) which needed to be lifted up above ground level. To do this I used large stones and broken brick to fill gaps.














A course of red brick was laid on top of the stone platform and leveled with a fireclay and sand mix before the firebrick floor was laid.